← PCB catalogue

PCB placement & routing · 8e1a729a90

Place components and route a complete board within its supplied mechanical and electrical constraints.

Construction controls passed 64 components

Task contract

Preserve component inventory, pad connectivity, fixed components, board outline and stackup while placing movable footprints and routing the board. Different valid layouts are accepted.

Supplied artifacts

KiCad project, complete schematic, and starting board with mechanical constraints and footprints. Task-specific fixed/movable component rules are included in the package.

Expected submission

A KiCad board file at /app/submission/design.kicad_pcb.

Runtime & isolation

Offline KiCad desktop with computer-use tools. Evaluator originals and grading configuration are protected from the agent. The audited package format specifies a five-hour agent budget, 4 CPUs and 8 GiB RAM. Final runtime configuration is part of the delivered archive.

Hidden grading & scoring

Original inventory, mechanical, connectivity and KiCad DRC gates remain mandatory. A task-specific continuous quality rubric evaluates valid layouts; failed correctness gates receive no quality credit.

Declared quality metrics: track length efficiency, layer balance, decoupling proximity, can pair matching, placement compactness.

Measured controls

Reference · Alternative valid layout · Three defect cases · Independent empty board · Independent wrong-net board.

Current limitations

Expert human scoring and independent semantic/simulation adequacy review are pending. Packaged circuit checks vary by task.

Package identity

pcb-8e1a729a90
Frozen archive SHA-256: af9ddd9399734582ff727e02a2125e91d908ce9698e092972b54ea84678e8adb

Archives, reference solutions and private tests are not served by this catalogue.

Read the PCB technical explanation →